MagazínHow to pavement

Considering paved parking areas and access roads to the house, garage or in the gazebo or on the terrace? Ideal material for this purpose pavement. The pavement is made of molded concrete in various colors and experienced handyman with appropriate tools with the laying her stride.

Considering paved parking areas and access roads to the house, garage or in the gazebo or on the terrace? Ideal material for this purpose pavement. The pavement is made of molded concrete in various colors and experienced handyman with appropriate tools with the laying her stride.
 

 

Site preparation for laying paving

From the quality of the training ground depends on the overall quality of paving. The first step is the identification of areas for laying tiles. The second step, the depth of the trench is dependent on the intended use laid tile. If we just walk along the pavement, we make do with a depth of about 35 cm. In the event that it will burden the vehicle, for example when parking or garage entrance to dig to a depth of almost 1 m.
 

Solid surface paving

Trench is needed first compact. Ideal assistant during the laying of paving the vibrating plate. Vibrating plate has a wide range of uses especially during compaction of soil, asphalt layers, gravel, stones and loose paving itself.
 

The first layer

The height of each layer is chosen according to a subsequent loading area. In the case of loading a car, will be the first layer height of about 35 cm. The first layer is composed of crushed rock having a coarseness of about 30 mm. Compaction layer will use a vibrating plate.
 

The second layer

Trampled on the first layer we put a finer grit stone with grit up to 8 mm in height of about 10 cm. In the case of loading the vehicle the first and second layer are repeated. Ie. thick layer, fine, coarse and fine layer again. Each layer of compacted using a vibrating plate. The area for the flooring must be perfectly flat and sloped.
 

Curbing and final layer

Use the curbs create edge surfaces for interlocking tiles. Curbing we do zvlhlého concrete and with a spirit level and string compare them. After hardening of concrete is needed for foundation compacts superimposed on the surface of fine dust and perfectly level surface using strips. On this layer is already not enter.
 

Laying the tiles

The thickness of the tile dial again according to the type of load. On the sidewalk just 60 mm, under the car, choose thickness of 80 mm. Using a grinder and diamond cutting wheels adjust the size of the tiles. After laying the tile surface sprinkle with quartz sand with a very fine grain. Silica sand we choose to allow us in the future between the tiles weeds. Again compacted surface vibration plate with a special sleeve. Subsequently, the surface again with sand. And it is done.